MAJOR PROJECTS
A.O.P.S (Arctic and Offshore Patrol Ship Project) - ROYAL CANADIAN NAVY (2016 - 2020)
Sitindustrie Marine SAS is proud to produce and deliver a package of 90/10 Copper Nickel pipes, fittings & flanges
for the Canadian Navy.
Sitindustrie Marine SAS is fully involved in A.O.P.S project which is to deliver 5 ice-capable ships.
Landing Helicopter Dock (LHD)/ Landing Platform Dock (LPD) CONSTRUCTION FOR TURKISH NAVY (2016 - 2021)
Sitindustrie Marine SAS participates in TCG ANADOLU PROJECT by delivering a consequent package of 70/30 & 90/10 copper nickel products for the construction of a LHD/LPD for the Turkish navy.
DELIVERY FOR U.S NAVY - GERALD FORD CLASS
USS JOHN KENNEDY (CVN-79) NUCLEAR AIRCRAFT CARRIER (2013 - 2022)
Sitindustrie Marine SAS has produced and delivered an important of package of 70/30 Copper Nickel Pipes welded & seamless pipes according to U.S Navy specifications for the construction of JOHN F. KENNEDY (CVN-79) nuclear aircraft carrier.
KAOMBO PROJECT (offshore) - TOTAL (2014 - 2018)
The project is an EPCI for the development of Kaombo field located off the coast of Angola.
The construction of 2 FPSOs has been done and 90/10 CuNi pipes, fittings & flanges have been produced and delivered by Sitindustrie Marine SAS during this project.
KAOMBO NORTE
KAOMBO SUL
CULZEAN PROJECT (offshore) - MODEC (2017 - 2018)
The project is to build a floating storage and unloading vessel for Maersk offshore Culzean project.
Sitindustrie Marine has supplied a very important package of 90/10 CuNi pipes, fittings & flanges.
HILLI FLNG (Floating liquefied natural gas offshore) - GOLAR LNG
Sitindustrie Marine SAS has produced and delivered 90/10 CuNi pipes, fittings & flanges up to 24" to provide a FLNG unit.